and reinforcement of the crawl space is

The floor slab and reinforcement were posed.


The floor is concrete beams with slabs of plastic.
A wire mesh is placed on it, connected by caps at chaining,
which itself rests on a leveled repellent around the perimeter of the slab to prevent moisture rising through capillary action of the crawl space.


chief work was planned 4 breakdowns for the crawl space and 2 in the garage.
A reserve is also provided in the garage to enter the crawlspace.